Planning
We review scope, existing conditions, equipment, code requirements, access, and future needs before work begins.
Overview
New construction electrical work starts long before wire is pulled. We coordinate service requirements, panel locations, circuit planning, lighting layouts, equipment loads, low-voltage needs, and inspection milestones with the overall build.
Early coordination with architectural, structural, mechanical, plumbing, low-voltage, and finish plans helps prevent conflicts and keeps electrical infrastructure accessible and organized.
Why Ampere
We review scope, existing conditions, equipment, code requirements, access, and future needs before work begins.
Work is completed with attention to clean routing, reliable connections, code compliance, and coordination with surrounding finishes.
We test and review completed systems and make sure the finished work is ready for normal use and future service.
Process
Confirm project goals, site conditions, existing equipment, and constraints.
Define scope, materials, routing, scheduling, and permit requirements where applicable.
Complete the work safely and coordinate with finishes, equipment, and other trades.
Verify operation, review the completed work, and address final details.
Common Questions
Ideally during planning, before framing and equipment locations are finalized. Early coordination reduces conflicts and makes service, panel, lighting, and equipment planning much easier.
Yes. Network, security, smart-home, and other low-voltage infrastructure can be coordinated with the electrical rough-in.
Yes. New-construction scope can include rough-in, trim-out, device installation, equipment connections, testing, and final electrical closeout.